A Recommended Post-Installation Acceptance Checklist
Published: Aug 28, 2026, 3:53 PM Views: 38 By Admin



A successful installation should be reviewed as a complete handover, not only as a finished appearance. The product, its operation, the frame-to-wall connection, and the work area should all be checked before the project is closed out.
What to Consider
A practical acceptance review includes appearance, sash or panel operation, locking, handles and hardware, gaskets, glass, drainage paths, perimeter finishing, protection of completed surfaces, and site cleanliness.
IGNIS Guidance
Record the location, condition, and resolution of any item that needs attention. After corrections are completed, verify the result before closing the issue and keep the relevant configuration and acceptance records.
Everyday Use and Care of Window and Door Hardware
Previous Article
Previous Article
Next Article
Confirming Color, Samples, and Renderings
Confirming Color, Samples, and Renderings

